top of page

FAN COOLING TOWERS

  • design work

  • assessment of the technical condition

  • repair valuation

  • optimization of water cooling parameters

  • general assembly and disassembly work

  • construction of a cold store made of GFK (FRP) materials

  • replacement and installation of fan gearboxes

  • replacement of droplet drift eliminators

  • replacement of cooling packages

  • replacement of splash apparatus

  • replacement and installation of open and closed water distribution systems

serwis chłodni wentylatorowych
bottom of page